Monday, July 13, 2020

It's July 2020 Already

I have been deep in multiple projects over the last two months and not said much about anything on this blog. 

Fine tuning of the track locations has recently become more pressing as I need to get the track finalized. The major plan is not changing, just moving track a few millimetres here and there.  



The picture is from my 780 P resolution  zoom camera mounted on my tripod looking across past the final version of the freight house just completed but not painted. 2870, an ex SSW locomotive sits in what will be one of the two roundhouse stalls. Beyond are mockups of the engine service outbuildings and a grounded wood sided passenger coach-baggage. At far right are buildings representing the small company stores warehouse at the end of the freight house track. Lumber is stacked there for pickup by a local lumber consignee.  

Nothing is really completed.  The garden tracks from the turntable and other trackage need to be buried in the ground. The freight station needs painting and the platform needs to be completed. The tree is from the old Padstow layout stationmaster's garden that was never completed. 

But the view represents a milestone of sorts as about a year ago I completed the benchwork. 

I am now in the midst of a technical project to set up a LocoFi WiFi controlled F7 A-B-A set that will run on the east-west SP main through Port Costa. There are a bunch of continuing tank car projects including the 3 SP O-50-13's I started a few months ago, A new Tangent tank car kit and acquisition of several additional tank cars that would used to service the Shell, Associated-Tidewater and Unocal refineries nearby.

I have been in a lot of zoom meetings and video conventions which take up time but also give me lots of new ideas. 

No comments:

Post a Comment